    of McFarland touted as the heartbeat of agriculture is nestled in the southern San Joaquin Valley of Kern County Graced with almost year round days of warm sunlight the City thrives on an enterprise of cotton sugar beets potatoes and roses A citrus processing plant almond hulling facility and vineyards also stimulate the area s economy Amidst this abundant agrarian culture the City operates a wastewater collection treatment and disposal facility for their residents and small industry As the on call Municipal Waste Water Engineer for McFarland Cannon has been involved in several projects surrounding the WWTP Recently the City chose to convert 160 acres of land previously utilized for vineyards into feed and fodder farming The decision stemmed from a need to comply with regulations that disallowed the use of secondary non disinfected effluent on vineyards Cannon provided professional services in four progressive phases vineyard removal RFP development and coordination pump station and irrigation pipeline design bidding services and construction services One of Cannon s most prominent achievements for the McFarland project was the completion of the WWTP s 20 year master plan The document presented plans which altered the existing aerated lagoon system into an extended aeration activated sludge plant with biological nutrient removal The plan estimated approximately 10 million in project costs which The City requested phased over a 7 year program starting with construction of the headworks and the aeration basin for the activated sludge plant The headworks facility design will include an influent parshall flume mechanical bar screen and a lift pump station for establishing hydraulics through the plant Back to Service Information Location McFarland California Market Wastewater Service Construction Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the

    Original URL path: http://cannoncorp.us/project/4121/?srv=1014 (2016-04-28)
    Open archived version from archive


  • CannonCorp Engineering Consultants | Highway 1 Improvements
    Next slide Back to Highway 1 Improvements Overview Cannon provided construction management and inspection services for the City of Guadalupe on its Highway 1 Federal Transportation Improvement Program Earmark Project This project consisted of removal and replacement of raised and broken concrete sidewalk on Guadalupe Street SR 1 and installation of more than 1050 ft of large diameter RCP storm drainage catch basins and utility relocations The work also consisted of drainage improvements such as cross gutter revisions driveway widening and reconstruction and new drainage inlets to eliminate stormwater surcharges and ponding Special construction requirements were incorporated regarding work within a busy commercial business area and agricultural commerce thoroughfare In addition to the construction management services provided to the City Cannon also provided funding administration related not only to this project but for upcoming projects as well This includes obtaining construction funding authorization preparing and processing the Caltrans Award package preparing progress and final invoices and preparing the completion package Back to Service Information Location Guadalupe California Service Construction Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and

    Original URL path: http://cannoncorp.us/project/highway-1-improvements/?srv=1014 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Road Rehabilitation and Overlay
    Overlay Overview Cannon provided construction management and inspection services to the City of Guadalupe for the rehabilitation of more than 3 miles of local roads and major regional transportation corridors throughout the city Scope of this 1 2M project included cold planing of existing asphalt removal and disposal of lead contaminated thermoplastic installation of Asphalt Protection Fabric HMA overlays Type II slurry seals and extensive re striping and pavement marking All manholes and utility valve covers are to be raised to match the new asphalt surfaces and new painted stripes thermoplastic pavement markings will be applied Some additional work to repair or replace damaged sidewalks curbs and gutters was also performed In addition to close coordination with the contractor and full documentation of construction activities and legal compliance Cannon developed and conducted a comprehensive public relations program for the purpose of informing residents and businesses of upcoming construction activities and working with the contractor and residents to maintain continual access and use of the roads during construction Back to Service Information Location Guadalupe California Service Construction Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of

    Original URL path: http://cannoncorp.us/project/2011-overlay/?srv=1014 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Bluff Stabilization
    Stabilization Overview As part of a 2 3 million effort the City is taking emergency actions to stabilize eroding bluffs in Shell Beach and prevent future bluff failure The stabilization efforts will effectively protect a sewage pumping station failure of which would cause approximately 500 to 600 homes to be without sewage services The stabilization effort target two locations the sewer pumping station and public access stairway at Vista del Mar Avenue and Ocean Boulevard and a section of Ocean Boulevard between Wawona and Capistrano avenues To enhance aesthetic appeal and maintain visual continuity the new seawall was sculpted and stained to fit in with the natural bluffs anchored into bedrock at the base of the bluff and no boulders or other material were placed on the beach The project was funded through a variety of sources money from maintenance projects the City has deferred general fund reserves and Federal and State funds including 865 000 from the State Department of Boating and Waterways Back to Service Information Location Pismo Beach California Service Construction Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant

    Original URL path: http://cannoncorp.us/project/pismo-beach-bluff-stabilization/?srv=1014 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Wastewater Treatment Plant Upgrade
    Board RWQCB The City received funding from Proposition 50 as well as through an Integrated Regional Water Management Planning Grant IRWMP Because of the funding sources the project was on a compressed schedule and very tight budget The project included new headworks improving and replacing key machinery a grit removal system which consisted of a new grit classifier and associated piping and controls conversion of the AIPS pond to a Biolac System construction of two new integral clarifiers and a new blower aeration system and new sludge handling facilities The sludge handling facilities included the installation of a dewatering sludge screw press and new waste activated sludge WAS pumps Because minimal shut downs of short durations of the plant were allowed during construction a systematic a meticulous planning and management process was required to accommodate continual operation of the existing facilities during construction As a result of this upgrade the plant is now in compliance with criteria of Title 22 water re use and recycling as well as the RWQCB discharge standards In addition the plant is better suited for future upgrades Back to Service Information Location Guadalupe California Market Wastewater Service Construction Management Contact Cannon Home About Careers Loose

    Original URL path: http://cannoncorp.us/project/wastewater-treatment-plant-upgrade/?srv=1014 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Pismo Beach Pier Improvements
    News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Construction Management Construction Management Construction Management Construction Management Previous slide Next slide Back to Pismo Beach Pier Improvements Overview The Historic Pismo Pier received a major facelift with the addition of the Promenade An elevated boardwalk the promenade travels along the easterly edge of the world renowned Pismo Beach in California The fourth and final phase of a multi year project this phase included lighting seating striping and parking changes pavers precast concrete railing system storm drain improvements underground detention storage and relocating a staircase to the sandy beach Cannon provided the construction management inspection and funding administration services As the City received ARRA funding for this project document control and compliance was a critical component Back to Service Information Location Pismo Beach California Service Construction Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater

    Original URL path: http://cannoncorp.us/project/pismo-beach-pier-improvements/?srv=1014 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Highway 46 East Dual Lefts, DPW No. 06-01A
    06 01A Overview As a major gateway from the Central Valley the 46 East Corridor has experienced significant increases in traffic levels over the last decade To mitigate further anticipated traffic increases the City of Paso Robles is constructing major improvements to the southbound US 101 46 East connection in order to compliment the Caltrans 46 East Corridor improvements Funded through a grant from the State Transportation Improvement Program STIP administered by San Luis Obispo Council of Governments SLOCOG the project entails the following features installation of an additional southbound left turn lane from the 46 East onto southbound US 101 construction of a second lane at the southbound on ramp to US 101 and an auxiliary lane abandonment of the existing off ramp at 16 th Street and installation of a new on off ramp and signalized intersection at 17 th Street widening of the 13 th Street Bridge installation of Type 60 Mod Barrier new road construction street enhancements reconstruction of four signalized intersections and ramp meter installation Back to Service Information Location Paso Robles California Service Construction Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark

    Original URL path: http://cannoncorp.us/project/highway-46-east-dual-lefts/?srv=1014 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Theatre Drive Realignment
    Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Bike Infrastructure Bike Infrastructure Bike Infrastructure Bike Infrastructure Previous slide Next slide Back to Theatre Drive Realignment Overview The Highway 101 Highway 46 West Interchange faced significant traffic congestion and a deteriorating level of service Modifications to the existing geometrics and signalization were necessary to improve local regional and interregional transportation circulation This project included disconnecting Theatre Drive from its original location and realigning it approximately 900 feet west along Highway 46 By doing so the City benefited from a reduction of existing and projected traffic congestion improvement of traffic operations and reduction of delays at the interchange Funded through ARRA additional coordination with the City was necessary to ensure all aspects of funding compliance Back to Service Information Location Paso Robles California Market Bike Infrastructure Streets Highway Service Construction Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water

    Original URL path: http://cannoncorp.us/project/theatre-drive-realignment/?srv=1014 (2016-04-28)
    Open archived version from archive



  •