archive-us.com » US » C » CANNONCORP.US

Total: 376

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • CannonCorp Engineering Consultants | Naval Air Weapons Station – China Lake
    office space within existing 36 699 SF Building 02466 Renovation included office furnishing configuration in existing 6 081 SF of existing office space within existing 63 238 SF Building 20210 Complete renovation of 11 625 SF Industrial Laboratory Building Cannon provided structural engineering services for this project Repair and Construction of Wing 8 in Historic Michelson Laboratory Building 00005 The project area was located within the existing Wing 8 of Michelson Laboratory Building 00005 Built in 1945 the Michelson Laboratory has been recognized as a Historic Building Because of this special attention to maintaining the exterior character was a critical requirement of this repair and construction project This was a multi phased project to repair 5 654 SF of interior space in a portion of Wing 8 Building 00005 as well as the design and construction of a 6 190 SF second floor interior mezzanine To accommodate the continued use of the adjacent lab spaces the work in this area required special attention to scheduling Identification and careful abatement of hazardous materials were included in the work Cannon provided structural engineering services for this project Bulkhead Repair The bulkhead for the storage magazine had separated from the building roof allowing water intrusion into the building The existing connection consisted of tie rods attached near the top of the bulkhead and welded to the building roof The repair consisted of replacing the existing tie rods with new tie rods utilizing a turnbuckle to close the separation between the bulkhead and the roof The scope of work included development of structural calculations for the structural components and preparation of construction documents Scope of work also included construction administration services including submittal review and RFI responses The design was prepared in accordance with the minimum requirements per the 2006 International Building Code Back

    Original URL path: http://cannoncorp.us/project/naval-air-weapons-station-china-lake/ (2016-04-28)
    Open archived version from archive


  • CannonCorp Engineering Consultants | Boeing / United Launch Alliance On-Call Engineering Services
    slide Back to Boeing United Launch Alliance On Call Engineering Services Overview Boeing United Launch Alliance selected Cannon to provide on call engineering design services for Space Launch Complexes 2 and 6 at Vandenberg Air Force Base The scope of services includes mechanical civil and structural engineering surveying and planning Projects include slope repairs HVAC modifications office remodels launch table redesign platform safety tie offs hydraulic drive system overhauls traffic studies and building trade studies Boeing launched the Delta IV rocket from SLC 6 on June 27 2006 This was the first launch of its kind from the West Coast More Samples The following projects are representative of some of the work that we have provided for Boeing United Launch Alliance SLC 6 Design 3D Scanning of MST Tower SLC 2 MST Level G H and J Sliding Door Refurbishment SLC 2 Greenhouse Refurbishment SLC 2 Pumphouse Refurbishment SLC 2 Launch Mount Repair Table and Flame Trench SLC 2 Building 1628 SLC 2 General A E Services Tank 370 Repair LV ECS Chiller Modifications Relief Valve Manifold MAS Valve Pit MST Interscan Installation Drawing Structural Evaluation of FUT MAS and MST Siding Dispersion Analysis and Area Classification Parking Lot Drainage Erosion Repair Building 394 MST Drive Replacement HIF Annex vs B398 Trade Study Seismic Retrofit Security Gate Design Installation GN2 Conversion to Instrument Quality Air MST Personnel Tie Off Protection Scrubber Containment Pad Main Gate Traffic Study Design Propane Tank and Piping As Built ECS Load Calculations Legal Description for Water Tank 5M Payload Fairing Access Ladder Back to Service Information Location Vandenberg Air Force Base Market Aerospace Defense Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree

    Original URL path: http://cannoncorp.us/project/boeing-facilities-group-on-call-engineering-services/ (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | San Ardo Secondary Water Plant WEMCO
    existing WEMCO without any shutdowns a Central Valley major oil company retained Cannon to facilitate development of the new unit After discovering a leak a temporary patch was placed under the tank to provide a seal allowing for continued operation With the current situation a full field shutdown 11k BOPD was required in order to carry out any repairs or maintenance work The tank component of the existing WEMCO was out of compliance and permanent repair work was required Cannon produced the building permits including grading plans for the installation of the Mechanically Induced Gas Flotation WEMCO Unit and associated building structures In addition Cannon gathered field data and performed site reconnaissance of pipeline routes and existing as built facilities developed a plot plan and mechanical equipment plot plan sized the pipelines and associated equipment as well as specified piping materials and equipment planned and coordinated acquisition of pre engineering surveys such as topographic maps and a soils report if none are available provided final engineering and design for the equipment foundation and provided other civil engineering work and any engineered pipe supports that were required Back to Service Information Location San Ardo California Market Industrial Wastewater Contact Cannon Home

    Original URL path: http://cannoncorp.us/project/san-ardo-secondary-water-plant-wemco/ (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Lubrizol Cooling Water Tower System
    scan modeling structural and I E engineering and construction administration services for this project holding downtime to a minimum by using efficient engineering and planning while implementing input from Lubrizol representatives Scope of services included the review of piping routing and materials selection for potential upgrades Cannon established a well defined communication strategy with the contractor to ensure compliance with the approved construction documents Electrical and controls engineering services included the preparation of sufficient plans and specifications to obtain a permit to construct the electrical and controls portion of the cooling tower system Cannon s Structural Engineering team provided drawings and calculations to obtain a permit and construct the structural portions of the water cooling tower system replacement The structural design included tank and equipment foundations pipe supports and berm design Additional services included site visits and coordination analysis and design of new and existing pipe supports anchorage of new and relocated equipment foundation design building permit submittal and plan check response Our Construction Administration team provided construction support and oversight during construction of the hydrochloric acid recovery system Back to Service Information Location Paso Robles California Market Industrial Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client

    Original URL path: http://cannoncorp.us/project/lubrizol-cooling-water-tower-system/ (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Oily Water Separator Controls Upgrade
    Landscape Architecture Forensic Engineering Municipal Engineer Careers Benefits General Information About Company Culture Cannon Relief Crew Loose Cannons Cannon Coaster News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Industrial Wastewater Back to Oily Water Separator Controls Upgrade Overview Cannon was chosen by a major power generation corporation to review the existing controls at the Oily Water Separation Plant OWS make recommendations for improvements and assist in the selection of new controls Cannon assisted with the selection of new ultrasonic level monitoring and control systems for two tanks Once the new level controls were installed Cannon recommended additional controls and further modifications to the control system Back to Service Information Location Morro Bay California Market Industrial Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater Watershed Management Civic Municipal Transportation Streets Highway Funding Bike Infrastructure Industrial Process Refining and Chemical Processing Food and Beverage

    Original URL path: http://cannoncorp.us/project/oily-water-separator-controls-upgrade/ (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Water Discharge System
    Industrial EPCM Landscape Architecture Forensic Engineering Municipal Engineer Careers Benefits General Information About Company Culture Cannon Relief Crew Loose Cannons Cannon Coaster News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Industrial Wastewater Back to Water Discharge System Overview Cannon was selected by a Central Valley major oil company to provide civil and surveying services for a two mile underground discharge system at their San Ardo Oilfield The scope of work included pipeline routing and infiltration system design reconstruction erosion and sedimentation control and Storm Water Pollution Prevention Plan The system provides for subterranean discharge of treated water to the Salinas River underflow Back to Service Information Location San Ardo California Market Industrial Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater Watershed Management Civic Municipal Transportation Streets Highway Funding Bike Infrastructure Industrial Process Refining and Chemical Processing Food and Beverage Aerospace Defense Industrial

    Original URL path: http://cannoncorp.us/project/water-discharge-system/ (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Produced Water Handling System
    Wastewater Back to Produced Water Handling System Overview For years a Central Coast oil and gas production company injected the majority of produced water from one of their off shore platforms into one of their onshore fields in Lompoc Any remaining produced water was returned to the platform for injection into the reservoir Since the Lompoc field was pressuring up onshore injection was no longer seen as the most effective solution Cannon was chosen to provide potential solutions for handling up to 80 000 bpd of produced water from the field Solutions included separating and treating produced water on the platform and then injecting offshore treating produced water at the onshore facility and anticipating future beneficial onshore use and or polishing produced water returned to the platform from an onshore facility for ocean outfall The scope of work included a completely engineered project ready for permitting procurement and installation Back to Service Information Location Santa Barbara County California Market Industrial Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016

    Original URL path: http://cannoncorp.us/project/produced-water-handling-system/ (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Business Park Water and Wastewater System Investigation
    Cannons Contact Cannon News Contact Us Industrial Wastewater Back to Business Park Water and Wastewater System Investigation Overview Tap It Brewing Company hired Cannon to investigate the existing water usage and discharge parameters at its current location within the boundaries of the Santa Fe Business Park Owners Association SFBPOA Tap It s lot is designed to have an allocated discharge flow limit of 180 gallons per day per established Covenants Conditions and Restrictions CCRs of the development dated May 2000 These CCRs contain specific wastewater discharge volume limits based on the number of employees occupying each of the 16 lots to drain into the sewer disposal system In order to increase discharge capacities consultants in the area bought capacity from Fiero Lane Water Company s FLWC Wastewater Treatment Plant WWTP SFPBOA including Tap It also obtains its water supply from the neighboring FLWC which consists of two tanks and three wells however high nitrates content often result in Do Not Drink notices Technical understanding and evaluation of the water and sewer systems in the area supports full treatment of the current water system for removing Nitrates and other constituents Because the option of Annexation would require certain discharge requirements various City connection and impact fees and future improvements to the existing infrastructure necessary treatment has been stalled It is Cannon s recommendation that further evaluation is conducted of the draft Memorandum of Agreement and its impacts to Tap It Brewing Company Back to Service Information Location San Luis Obispo California Market Industrial Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation

    Original URL path: http://cannoncorp.us/project/water-and-wastewater-system-investigation/ (2016-04-28)
    Open archived version from archive



  •