  • CannonCorp Engineering Consultants | Diablo Canyon Nuclear Power Plant Spent Fuel Storage
    ISFSI at DCPP Due to the uncertainty of a national repository for used nuclear fuel this phased project allowed for onsite storage of all of the used fuel generated by the plant Cannon was chosen to provide engineering and design services to help facilitate the transport of the 180 ton spent nuclear fuel rod casks from the reactor building area to the storage pad in the nearby canyon Cannon s scope of work included detailed drainage analysis and the preparation of plans and specifications for road designs utility and drainage realignments and retaining walls Other work included excavation and grading plans to move approximately 100 000 yards of rock permitting assistance coordination with the San Luis Obispo County Building and Safety Division assistance with the development of short and long term strategies to achieve appropriate setback from areas affected by landslides and coastal erosion and design of a fire water protection system to protect the ISFSI and Used Steam Generator Storage Facility This project was voted Project of the Year for 2007 by the American Public Works Association APWA Back to Market Information Location Avila Beach California Market Utilities Power Energy Power Contact Cannon Home About Careers Loose Cannons Cannon

    Original URL path: http://cannoncorp.us/project/diablo-canyon-power-plant-isfsi-area/?mkt=644 (2016-04-28)
    Open archived version from archive


  • CannonCorp Engineering Consultants | Casa Dorinda Cogeneration Facility
    Coaster News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Power Power Power Power Previous slide Next slide Back to Casa Dorinda Cogeneration Facility Overview Cannon prepared plans and specifications for site grading and drainage driveway design and layout trench layout asphalt and concrete patching and sealing details In addition Cannon provided final designs for the power control and instrumentation interconnections between the skid mounted equipment and facility equipment as well as designing the foundations for the main generator skid the exhaust stack and the structure for the one story cogen enclosure building The scope of work also included the preparation of permit submittals for the Air Board City of Montecito Planning Department Santa Barbara County Planning Department OSHPD and Utility Interconnect Agreement Back to Market Information Location Montecito California Market Utilities Power Energy Power Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater Watershed

    Original URL path: http://cannoncorp.us/project/casa-dorinda-cogeneration-facility/?mkt=644 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | General Chemical Cogeneration Facility
    Information About Company Culture Cannon Relief Crew Loose Cannons Cannon Coaster News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Power Power Power Power Previous slide Next slide Back to General Chemical Cogeneration Facility Overview The General Chemical facility produces sulfuric acid for clients including refineries Cannon was selected to provide the preliminary engineering analysis and detailed engineering design for a 1 3 MW gas fired IC engine cogeneration facility The cogen unit will generate the base electric load and the exhaust heat will supplement a process heater The project scope included preparation of PFD P IDs equipment layout design equipment pad design electrical installation design electrical procurement specification and road realignment design Back to Market Information Location Richmond California Market Utilities Power Energy Power Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater Watershed Management Civic Municipal Transportation Streets Highway Funding Bike Infrastructure Industrial

    Original URL path: http://cannoncorp.us/project/general-chemical-cogeneration-facility/?mkt=644 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Morro Bay Power Plant – Pedestrian Access Easement
    Structures Construction Management Industrial EPCM Landscape Architecture Forensic Engineering Municipal Engineer Careers Benefits General Information About Company Culture Cannon Relief Crew Loose Cannons Cannon Coaster News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Power Power Power Power Previous slide Next slide Back to Morro Bay Power Plant Pedestrian Access Easement Overview The Morro Bay Power Plant selected Cannon to provide survey services for a new sidewalk installation The scope of work included a topographic survey legal descriptions and exhibits The legal description and exhibit detailed the area along the Morro Bay Embarcadero that was to be made into pedestrian access easement Back to Market Information Market Utilities Power Energy Power Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater Watershed Management Civic Municipal Transportation Streets Highway Funding Bike Infrastructure Industrial Process Refining and Chemical Processing Food and Beverage Aerospace Defense Industrial Wastewater Aerospace Defense

    Original URL path: http://cannoncorp.us/project/morro-bay-power-plant-pedestrian-access-easement/?mkt=644 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Morro Bay Power Plant Generator Replacement Project
    Landscape Architecture Forensic Engineering Municipal Engineer Careers Benefits General Information About Company Culture Cannon Relief Crew Loose Cannons Cannon Coaster News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Power Power Power Power Previous slide Next slide Back to Morro Bay Power Plant Generator Replacement Project Overview Cannon provided survey services to the Morro Bay Power Plant to help facilitate the replacement of their generator circa 1952 As part of this effort Cannon was tasked with aligning the shaft for placement of the new generator Cannon provided the control to tie into the Plant Grid as well as construction layout Back to Market Information Location Morro Bay California Client Morro Bay California Market Utilities Power Energy Power Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater Watershed Management Civic Municipal Transportation Streets Highway Funding Bike Infrastructure Industrial Process Refining and Chemical Processing Food and Beverage

    Original URL path: http://cannoncorp.us/project/morro-bay-power-plant-generator-replacement-project/?mkt=644 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Biodiesel Process Equipment
    Loose Cannons Contact Cannon News Contact Us Power Power Power Power Previous slide Next slide Back to Biodiesel Process Equipment Overview A prototype ten thousand gallon per day capacity biodiesel processing plant was built in Bakersfield and installed in Denton Texas The plant is unique in that it processes used fryer oil and other vegetable oil to obtain diesel methanol and glycerin Biodiesel is a renewable alternative to petroleum diesel and can be used by itself or blended with petroleum diesel It substantially reduces air pollution and is nontoxic and biodegradable Cannon reviewed materials sized equipment designed and drafted a comprehensive piping and instrument diagram P ID and pump and piping systems assisted in development of the control philosophy and operating procedures design seismic analysis of the skid and equipment reactors chillers tanks cyclone separators provided fabrication and assembly details Back to Market Information Location Bakersfield California Market Utilities Power Energy Power Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities

    Original URL path: http://cannoncorp.us/project/biodiesel-process-equipment/?mkt=644 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Guadalupe Oil Field Remediation and Deconstruction Project
    preservation habitat adjacent to the Pacific Ocean After 50 years of oil production the leasee closed its operation A production infrastructure of 168 miles of pipelines and 240 wells required deconstruction After much characterization studies Unocal determined that diluent plumes existed under approximately 187 acres of the oil field Remediation projects included full excavation of plumes and or sumps partial excavation with in situ recovery systems active product recovery bioremediation of excavated soils and other actions approved by the RWQCB such as in situ remediation biodegradation in the Land Treatment Unit LTU and phytoremediation Cannon was selected to provide engineering surveying and permitting and compliance services for this project The scope of work for this project included an implementation plan preparation of plans and specifications for grading and drainage for removal of approximately 300 000 cubic yards of hydrocarbon affected material and 30 000 cubic yards of sump material road construction layout of approximately 7 000 wall feet of sheet pile emergency permitting and agency approvals construction management and pipeline abandonment The project cost was more than 20M Back to Market Information Location Guadalupe California Market Remediation Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for

    Original URL path: http://cannoncorp.us/project/guadalupe-oil-field-remediation-and-deconstruction-project/?mkt=650 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Avila Beach Remediation Project
    than 200 000 tons of affected material was excavated and an equal amount of clean soil was brought in 10 000 truckloads were driven a total of 2 8 million accident free miles to dispose of the waste Reconstruction of the public utilities and street improvements and park Cannon prepared plans specifications and cost estimates for grading drainage and structural shoring for the beach properties and several of the town properties affected by the contamination This included the layout of steel sheet pile cofferdam removal and replacement of sand placement of a high density polyethylene HDPE liner and the design of offsite temporary storage facilities for stockpiling the hydrocarbon affected sand We prepared plans and specifications for approximately 4000 feet each of water sewer storm drain gas and wire utility mains and services We worked closely with the client the utility companies the regulatory agencies the contractors and the other consultants to prepare a well planned design within the project s timeframe In addition Cannon was part of a team of consultants who developed a feasibility study of alternatives to address the options of solidification and or excavation of hydrocarbon affected sand prior to the excavation Cannon prepared the cultural resources evaluation which identified buildings to be saved because of historic character In addition we participated in weekly coordination and planning meetings to implement all phases of the master plan including the replacement of buildings and the installation of streets and utilities water sewer gas electricity storm drainage telephone and cable TV Overall more than 60 permits and approvals from more than 10 government agencies were needed to complete the project Cannon prepared work plans and documentation coordinated with and processed the permits through the permitting agencies We participated in weekly meetings with the agencies and prepared weekly project schedules

    Original URL path: http://cannoncorp.us/project/avila-beach-remediation-project/?mkt=650 (2016-04-28)