archive-us.com » US » C » CANNONCORP.US

Total: 376

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • CannonCorp Engineering Consultants | Salinas Dam Booster Pump Station
    pumps water from Santa Margarita Lake up and over the Cuesta Grade down into the City of San Luis Obispo A 4400 gallon steel surge tank is utilized to control surges in the system that could cause potential damage to the downstream supply line Regular up keep and maintenance have kept the facility in good working condition but there is a possibility of failure due to the aging equipment Cannon was selected to provide engineering and construction engineering services for upgrades to the facility Scope of work included a preliminary design and report review and verification of existing facilities surge analysis report and preparation of plans specifications and cost estimates Design services included survey of existing site conditions coordination with utility providers electrical design and site and mechanical design Bid support services included responding to RFIs review of contractor submittals identification of milestone inspections attending key construction meetings preparation of record drawings and technical assistance to answer contractor and District questions The structural inspection and tank coatings investigation confirmed significant tuberculation and metal loss on the interior of the tank Rehabilitation was not an option in this case and the design of a new 4 000 gallon steel surge tank was incorporated Important Engineering Features Designed 6 000 gpm pump station and appurtenant facilities Used same footprint as existing building Design of new bladder style surge tank to control water hammer on the pipeline Designed to be taken out of service for only a minimal period of time during switchover Has the capability to isolate sections of piping for maintenance needs Project Accomplishments Met future water needs Converted power supply from Primary to Secondary Metering to save operational costs Prepared design that allows for a limited duration of downtime during construction of upgrades Back to Market Information Location San Luis

    Original URL path: http://cannoncorp.us/project/salinas-dam-booster-pump-station-2/?mkt=662 (2016-04-28)
    Open archived version from archive


  • CannonCorp Engineering Consultants | Santa Monica Water Main Replacement
    Engineer Careers Benefits General Information About Company Culture Cannon Relief Crew Loose Cannons Cannon Coaster News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Water Supply Water Supply Previous slide Next slide Back to Santa Monica Water Main Replacement Overview To ensure the supply of dependable safe quality drinking water the City of Santa Monica replaced existing cast iron pipe water mains with ductile iron pipe Cannon provided engineering design services for the abandonment and removal of approximately 12 500 linear feet of deteriorated 6 8 and 12 inch diameter cast iron and asbestos cement pipe and the installation of approximately 12 500 linear feet of ductile iron pipe Back to Market Information Location City of Santa Monica California Market Water Supply Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater Watershed Management Civic Municipal Transportation Streets Highway Funding Bike Infrastructure Industrial Process Refining and

    Original URL path: http://cannoncorp.us/project/santa-monica-water-main-replacement/?mkt=662 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Arsenic Mediation Project, Water Production Facility, Phase I
    Water Production Facility Phase I Overview Several wells within the City of Delano s water system were found to have unacceptable arsenic levels To alleviate this situation and improve the available potable water supply the City drilled seven new domestic water wells Cannon provided topographic survey record data boundary and utility research as well as design and construction phase support services for the pump motors necessary electrical equipment and discharge piping to connect to the existing water distribution system The scope of services included site work a well enclosure building grading drainage paving sewer main and storm drain design Cannon coordinated the design of a sodium hypochloride disinfection system as well as the well design with the City s hydrogeologist for the 150 horsepower 1 000 gpm pumps and motors Cannon prepared construction documents including bid documents and construction cost estimates and provided construction support services for two wells The remaining five wells were designed at various stages of completion Back to Market Information Location City of Delano California Market Water Supply Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive

    Original URL path: http://cannoncorp.us/project/arsenic-mediation-project-water-production-facility-phase-i/?mkt=662 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Avenue K 36-inch Transmission Main, Phases I and II, Los Angeles County Waterworks District No. 40
    Main Phases I and II Los Angeles County Waterworks District No 40 Overview Cannon s services include the preparation and design of final plans and specifications for 16 000 feet of 36 inch cement mortar lined and coated steel pipe Both transmission main phases are designed to improve water reliability in the 2555 PZ A large portion of the project will cross the Union Pacific Railroad Numerous crossings of water gas telephone sewer and storm drains along Avenue K are also included The pipeline will be installed by the jack and bore method Cannon s scope of work includes coordination with railroad personnel to obtain required permits and authorization to cross the railroad s right of way as well as preparation of the topographic survey plans specifications plans bid documents and engineer s cost estimate for the transmission main During construction Cannon will provide consulting services for submittal review RFIs billing review site visits as built drawings and assistance with the final punch list Back to Market Information Location Lancaster California Market Water Supply Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution

    Original URL path: http://cannoncorp.us/project/avenue-k-36-inch-transmission-main-phases-i-and-ii-los-angeles-county-waterworks-district-no-40/?mkt=662 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Water Reuse Project
    Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Water Supply Water Supply Previous slide Next slide Back to Water Reuse Project Overview The team of Brown Caldwell and Cannon was selected by the City of San Luis Obispo to design additional features to the City s sewer treatment plant and approximately seven miles of distribution pipelines These improvements will allow reclaimed sewer effluent from the plant after specialized treatment to be reused for irrigation purposes throughout the City Cannon assisted with the preliminary and final planning for the project which included an alignment analysis provided pipeline design services for over 41 000 lineal feet of pipeline with diameters ranging from 10 inches to 20 inches and prepared a topographic surveying for the project which included aerial topographical and supplemental surface utility surveying services Back to Market Information Location San Luis Obispo California Market Water Supply Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency

    Original URL path: http://cannoncorp.us/project/water-reuse-project/?mkt=662 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | City of South Pasadena Wilson Well No. 2 Rehabilitation and Reconstruction
    slide Next slide Back to City of South Pasadena Wilson Well No 2 Rehabilitation and Reconstruction Overview Cannon provided plans and specifications to equip the recently recased Wilson Well No 2 which pumps water to Wilson Reservoir There the water will be chlorinated blended with water from two other wells and pumped into the City of South Pasadena s water system Cannon s scope of services included review of the well test reports preparation of the design report selection design and installation of a new 1200 gpm 150hp vertical turbine well pump including suction and discharge piping and connection to discharge main gate valves sand separation air release valves electrical system and SCADA system Cannon s services also included design of an aesthetically appealing building and perimeter block wall site grading drainage and paving storm drain system design coordination of the topographic survey and secondary noise abatement study and assistance fulfilling CEQA requirements Back to Market Information Location San Gabriel California Market Water Supply Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks

    Original URL path: http://cannoncorp.us/project/city-of-south-pasadena-wilson-well-no-2-rehabilitation-and-reconstruction/?mkt=662 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Water and Sewer Master Plan Update (2006)
    Partnership Loose Cannons Contact Cannon News Contact Us Wastewater Wastewater Previous slide Next slide Back to Water and Sewer Master Plan Update 2006 Overview The Nipomo Community Services District selected Cannon to update their Water and Sewer Master Plan The District determined an update was necessary because of many significant changes including an update to the LAFCO Sphere of Influence Study a Supplemental Water Inter tie Project an update to the Wastewater Treatment Facility Master Plan changes to the Sewer System Overflow Regulations and several proposed large development projects The scope of work included preparing water demand and sewer loading projections water and sewer modeling and training analysis of future water and sewer regulation evaluations recommendations for projects project identification and prioritization hazard and security evaluation O M work forecast and staffing plan and master plan report preparation Back to Market Information Location Nipomo Community Service District California Market Water Supply Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities

    Original URL path: http://cannoncorp.us/project/water-and-sewer-master-plan-update-2006/?mkt=662 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Water System Improvements at Busch Drive and Merritt Drive
    Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Water Supply Water Supply Previous slide Next slide Back to Water System Improvements at Busch Drive and Merritt Drive Overview Santa Monica Malibu Unified School District selected the Cannon Parsons team for the water system improvements project at Busch and Merritt drives to provide adequate fire flow and pressure to Malibu High School and Middle School Cannon provided surveying and civil engineering design for additional water mains a pressure regulating station and necessary interconnections Services included topographic survey and utility research design for approximately 2 200 linear feet of 12 inch steel and ductile iron pipe as well as design for a pressure regulating station located at the Lower Busch Tank site that reduced the pressure from 860 PZ to 325 PZ Back to Market Information Location Santa Monica California Market Water Supply Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources

    Original URL path: http://cannoncorp.us/project/water-system-improvements-at-busch-drive-and-merritt-drive/?mkt=662 (2016-04-28)
    Open archived version from archive



  •