archive-us.com » US » C » CANNONCORP.US

Total: 376

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • CannonCorp Engineering Consultants | Tower Road Well and Transmission Main
    Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Water Supply Water Supply Previous slide Next slide Back to Tower Road Well and Transmission Main Overview The City of Paso Robles selected Cannon to design wellhead facilities a one mile stretch of pipeline and distribution system connections The project included installation of a well new pump electrical system chlorination system connection to the City s SCADA system and construction of new pipeline to connect the new well to the existing distribution system Cannon provided pre design alternatives analysis utility coordination preparation of plans and specifications for water systems as well as construction management services The piping and valve design included approximately 6 300 feet of ten inch ductile iron transmission main and associated appurtenances Cannon additionally provided topographic right of way and construction surveys Back to Market Information Location City of Paso Robles California Market Water Supply Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy

    Original URL path: http://cannoncorp.us/project/tower-road-well-and-transmission-main/?mkt=662 (2016-04-28)
    Open archived version from archive


  • CannonCorp Engineering Consultants | Dryden Street Water Main Replacement
    Local Community Partnership Loose Cannons Contact Cannon News Contact Us Water Supply Water Supply Previous slide Next slide Back to Dryden Street Water Main Replacement Overview The City s existing 4 inch diameter cast iron water mains had deteriorated and were in need of replacement Cannon provided design and engineering services to replace 6 400 linear feet of water mains with 8 inch and 6 inch diameter ductile iron water mains The replacement included new valves and fittings blow offs service connections meter and meter box and new fire hydrants In addition Cannon provided services for 1 210 linear feet of new water mains in the vicinity of Randolph Street where there are low water pressure problems As part of this project Cannon prepared a pressure zone conversion and analysis to determine feasibility of a 100 psi working pressure increase Back to Market Information Location Glendale California Market Water Supply Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power

    Original URL path: http://cannoncorp.us/project/dryden-street-water-main-replacement/?mkt=662 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | K-8/Division Dual Pressure Zone Pump Station, Los Angeles County Waterworks District No. 40
    station provides 3 200 gpm and 1 500 gpm capacity to the 2555 and 2696 Pressure Zones respectively In addition to the preparation of plans specifications and the engineer s opinion of probable cost the project included hydraulic analyses of the existing forebay reservoir piping and remediation of unequal tank levels during fill and emptying cycles Cannon assisted in the hydraulic analysis of the existing water system reviewed available pump test data and assisted in generation of the final hydraulic system curves which was used to select optimum pumping equipment The scope of work also included selection of pumps valves control valves flow meters and design of piping grading paving drainage and appurtenances Currently Cannon provides construction engineering services for submittal review RFIs billing review site visits as built drawings and will assist with preparation of the final punch list In addition to the pump station this project included the design of a chloramination disinfection facility and coordination in conjunction with a subconsultant specializing in water disinfection The facility will be operated by the Los Angeles County Waterworks District No 40 Lancaster California Back to Market Information Location Lancaster California Market Water Supply Contact Cannon Home About Careers Loose Cannons

    Original URL path: http://cannoncorp.us/project/k-8division-dual-pressure-zone-pump-station-los-angeles-county-waterworks-district-no-40/?mkt=662 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Thunderbird Wells 16-inch Waterline
    Partnership Loose Cannons Contact Cannon News Contact Us Water Supply Water Supply Previous slide Next slide Back to Thunderbird Wells 16 inch Waterline Overview Cannon provided engineering surveying design analysis and construction management for the 16 inch Thunderbird Waterline Cannon developed three alignment alternatives for the waterline providing constraints feasibility and cost analysis for each alignment Cannon was also responsible for providing permitting services for the trenching directional drilling across the Salinas River and preparation of construction documents for the project The most significant challenge associated with this project was the crossing of the Salinas River Permits were required and obtained from the Army Corp of Engineers US Fish and Wildlife California Department of Fish and Game and the Regional Water Quality Control Board The construction method used was Horizontal Directional Drilling for the 800 feet crossing of the river Back to Market Information Location Paso Robles California Market Water Supply Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines

    Original URL path: http://cannoncorp.us/project/thunderbird-wells-16-inch-waterline/?mkt=662 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Templeton Interceptor Line Lift Station No.2 and Sewer Reach 2 & 4
    station and the sewer main reaches were running at or near capacity and therefore were limiting the efficiency and ultimate build out service of the Templeton Interceptor Line To solve this problem the City of Paso Robles decided to upgrade Lift Station No 2 and Reach 2 4 of the Templeton Interceptor Line to increase the flow capacities Cannon provided the surveying and engineering design services for the project The scope of work included fundamental project research and data collection as well as project meetings and coordination efforts preparation of engineering plans specifications and cost estimates for the construction of lift station upgrades and approximately 10 000 lineal feet of new sewer mains and construction administration services The construction administration services including bid support a pre construction meeting construction engineering site visits and inspections and as built drawing preparation and submittal In addition Cannon prepared a topographic survey aerial topographic surveying and supplemental design surveying as needed to define the existing surface features and as built conditions for the lift station and Reach 2 Back to Market Information Location Paso Robles California Market Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a

    Original URL path: http://cannoncorp.us/project/templeton-interceptor-line-lift-station-no-2-and-sewer-reach-2-4/?mkt=664 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Wastewater Treatment Plant Feasibility Study
    Wastewater Previous slide Next slide Back to Wastewater Treatment Plant Feasibility Study Overview The City of Morro Bay operates a wastewater treatment plant in conjunction with the town of Cayucos The plant is nearing capacity and facing upcoming regulatory requirements to improve effluent quality prior to ocean discharge Several years ago the City had explored the idea of constructing a separate wastewater plant to serve only the City for potential beneficial reuse of the effluent To this end Cannon prepared an updated Feasibility Study to examine potential benefits and potential â œfatal flawsâ associated with construction of a stand alone wastewater plant in lieu of expanding the existing plant Cannon prepared an analysis for both current and future flow rates examined water quality challenges and identified potential solutions reviewed current and anticipated regulatory requirements updated system design requirements developed a cost estimate and staffing plan and identified potential funding sources Back to Market Information Location Morro Bay California Market Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU

    Original URL path: http://cannoncorp.us/project/wastewater-treatment-plant-feasibility-study/?mkt=664 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Vintage Communities Sewage Lift Station
    Us Wastewater Wastewater Previous slide Next slide Back to Vintage Communities Sewage Lift Station Overview Cannon prepared design plans and specifications for the sewage lift station for the 198 acre Village at Rancho Malibu The sewage lift station consists of an 8 x8 x17 5 concrete wet well and two alternating 136 gpm submersible horizontal pumps with a 4 inch sphere diameter for adequate solid passing The 6 x9 x7 valve vault is directly adjacent to the wet well with automatic ventilation activation upon opening of the vault hatches The piping consists of 4 inch stainless steel and ductile iron pipe and discharges to a wastewater treatment plant located within the development The controls operating the pumps are integrated into the SCADA system for constant monitoring of the system The station operates constantly with a compressor and EVC to prevent anaerobic conditions in the wet well and force main Back to Market Information Location Malibu California Market Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets

    Original URL path: http://cannoncorp.us/project/vintage-communities-sewage-lift-station/?mkt=664 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Tank Farm Road Sewer Project
    About Company Culture Cannon Relief Crew Loose Cannons Cannon Coaster News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Wastewater Wastewater Previous slide Next slide Back to Tank Farm Road Sewer Project Overview The team of Brown Caldwell and Cannon provided engineering surveying and construction management services for the abandonment of three existing sewer lift stations and the construction of a new regional lift station and related sewer mains The new sewer mains totaled 6 750 liner feet of 16 inch 250 linear feet of 12 inch 4 000 linear feet of 10 inch and 1 000 linear feet of 8 inch gravity sewer mains and 4 000 linear feet of 16 inch sewer force main Back to Market Information Location San Luis Obispo California Market Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater Watershed Management Civic Municipal Transportation Streets Highway Funding Bike

    Original URL path: http://cannoncorp.us/project/tank-farm-road-sewer-project/?mkt=664 (2016-04-28)
    Open archived version from archive



  •