  • CannonCorp Engineering Consultants | Laguna Lift Station and Sewer Force Main
    Back to Laguna Lift Station and Sewer Force Main Overview The team of Brown Caldwell and Cannon provided surveying designs construction plans and specifications for a replacement raw sewer lift station and new sewer force main at the City s Water Reclamation Facility near Laguna Lake The new lift station with a design capacity of 3800 GPM replaced an undersized existing sewer lift station in the same proximity The new system included three 30 HP vertical column pumps situated within a single 10 500 gallon wet well each pump capable of 1900 GPM at 50 feet of head The pumps discharged through 2 250 lineal feet of new 16â PVC force main that connects to an existing 54â public gravity sewer main Providing temporary bypass lines and maintaining the operation of the existing lift station during the construction was a significant design consideration and project constraint which was successfully overcome by the design team Back to Market Information Location San Luis Obispo California Market Wastewater Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service

    Original URL path: http://cannoncorp.us/project/laguna-lift-station-and-sewer-force-main/?mkt=664 (2016-04-28)
    Open archived version from archive


  • CannonCorp Engineering Consultants | Final Design of 21st Street Improvements
    Back to Final Design of 21st Street Improvements Overview Historic runoff from the Mountain Springs Creek watershed along with subsequent development of the urban areas over the course of several decades has resulted in frequent flooding poor pavement and inadequate facilities for bicycles and pedestrian traffic To remedy this the City of Paso Robles in partnership with the Central Coast Low Impact Development LID Initiative and SvR Design Company SvR developed a conceptual design for a green complete street and stormwater enhancement project along 21st Street between Vine Street and Riverside Avenue Cannon was selected to continue with the design and implementation of the project The City s goals for the project are to reduce the frequency and severity of street flooding increase groundwater recharge improve the quality of stormwater runoff reaching the Salinas River sediment removal reduction of traffic speeds with traffic calming devices shade the street with trees re map the 100 yr corridor and promote infill and redevelopment Back to Market Information Location Paso Robles California Market Watershed Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive

    Original URL path: http://cannoncorp.us/project/final-design-of-21st-street-improvements/?mkt=666 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Oceano Drainage Improvement
    Crew Loose Cannons Cannon Coaster News Community Partnership Global Community Partnership Local Community Partnership Loose Cannons Contact Cannon News Contact Us Watershed Management Watershed Management Watershed Management Watershed Management Previous slide Next slide Back to Oceano Drainage Improvement Overview The intersections of 13th Street Hwy 1 and 17th 19th Street Hwy 1 in Oceano experienced flooding during significant rain events Cannon is currently working with the County to design new storm drain improvements to alleviate these drainage issues Improvements include new inlet structures culvert pipes junction structures LID detention basins and outlet facilities Major considerations include hydrology and hydraulics i e upstream downstream drainage impacts topography property access acquisition railroad crossings utility conflicts environmental permitting construction and O M costs and implementation schedule Back to Market Information Location Oceano California Client County of San Luis Obispo Market Watershed Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU Home Markets Energy Upstream Pipeline Power Remediation Utilities Pipelines Power Energy Efficiency Water Resources Water Supply Wastewater Watershed Management Civic Municipal

    Original URL path: http://cannoncorp.us/project/oceano-drainage-improvement/?mkt=666 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Waterways Management
    slide Next slide Back to Waterways Management Overview The City of San Luis Obispo and the County Flood Control District are working together to mitigate future flooding The objective of this Waterways Management Project is to lower the n value in the channel to increase capacity and thereby reduce future flooding To do this the City of San Luis Obispo is planning to remove accumulated sediment from five separate locations within San Luis Obispo Creek and Prefumo Creek The City selected Cannon to provide engineering plans as well as to help obtain grading and environmental permits from the Army Corp the Regional Water Quality Control Board and Fish Game Cannon s scope of work included pre and post construction topographic surveys grading plans with cross sections and cut fill quantities SWPPP Erosion and Sediment Control plans and permit application preparation The complexity of the project was increased because of the extremely tight deadline and environmental sensitivity Back to Market Information Location San Luis Obispo California Market Watershed Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of

    Original URL path: http://cannoncorp.us/project/waterways-management/?mkt=666 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Drainage Study for the Villages at Dove Creek
    contains 297 single family residences condominium townhomes courtyard homes and a 60 000 square foot neighborhood commercial center Cannon was selected by the development firm to provide engineering planning surveying and construction administration services for the Villages at Dove Creek in Atascadero California Engineering services for this project included the preparation of a tentative map a detailed drainage study and FEMA CLOMR analysis and approval grading and drainage plans sewer and water master plan studies utility system design opinions of probable costs as well as construction documents The drainage study included specialized design of detention basins that matched flow patterns to the storm events which were configured to be dual use as parks and designed to control outlfow Cannon also coordinated with regulatory agencies for permits and compliance This work included coordination with the Army Corps of Engineers for a Wetlands 404 permit and NPDES permitting through the Regional Water Quality Control Board Surveying services included the preparation of a tentative tract map final map topographic survey condominium plans agricultural ALTA survey boundary survey and construction staking Back to Market Information Location Atascadero California Market Watershed Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for

    Original URL path: http://cannoncorp.us/project/drainage-study-for-the-villages-at-dove-creek/?mkt=666 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Ashwood Place Culvert Replacement
    Management Watershed Management Watershed Management Watershed Management Previous slide Next slide Back to Ashwood Place Culvert Replacement Overview Cannon was selected by the City of Paso Robles to provide engineering construction management and land surveying services for the design and construction of the Ashwood Place Culvert Replacement project Cannon provided drainage analysis construction documents specifications pre bid support construction engineering support and construction observation services Cannon s survey department also provided the topographic survey and construction staking for this project The scope of work included design of culvert headwall and endwall structures as well as analysis of potential downstream drainage impacts In the end Cannon provided a solution that minimized schedule and cost by preserving the existing culvert and designing a twin parallel culvert system In addition through the design the City was able to avoid conflicts with many existing utilities and minimize utility service downtime to affected residents Back to Market Information Location Paso Robles California Market Watershed Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are service marks of Cannon 2016 MENU

    Original URL path: http://cannoncorp.us/project/ashwood-place-culvert-replacement/?mkt=666 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | 23.5 Acre Damon Garcia Sports Facility
    Watershed Management Previous slide Next slide Back to 23 5 Acre Damon Garcia Sports Facility Overview The City of San Luis Obispo constructed a public sports facility on 23 5 acre parcel of land within the City of San Luis Obispo California This sports facility included four baseball softball fields and three overlapping soccer fields In addition this project included a 1500 linear foot extension to Prado Road which is adjacent to the park two bridges along Prado Road an on site parking lot for the park and multiple pedestrian trails with creek crossings Cannon was selected to provide the engineering design and survey services for this project These services included preparation of plans specifications and opinions of probable cost for grading drainage off site improvements infrastructure and utilities Cannon prepared multiple storm event flood plain analyses of over 3000 linear feet of Acacia Creek and over 2000 linear feet of Orcutt Creek as they traverse and bisect the park site Cannon also prepared preliminary vertical and horizontal alignment alternatives for the Prado Road extension bridge and pedestrian crossing schematics and preliminary on site improvement plans Of particular interest for this project is the flood plain analyses and grading designs that allowed for construction within a known FEMA flood plain without adverse impacts to upstream or down stream properties The project development program called for certain fields to be constructed outside of the flood plain while others were built within the flood plain boundaries and are inundated by occasional storm flows without undue damage Back to Market Information Location San Luis Obispo California Market Watershed Management Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark of Cannon Pursuit of the Elegant Solution Reliable Responsive Solutions and Tree of Sustainability are

    Original URL path: http://cannoncorp.us/project/23-5-acre-damon-garcia-sports-facility/?mkt=666 (2016-04-28)
    Open archived version from archive

  • CannonCorp Engineering Consultants | Irish Hills Bike Path
    mitigation set forth by the Air Pollution Control District APCD for the Irish Hills Plaza project Madonna Enterprises entered into a Memorandum of Understanding with the City and APCD to construct a Class I Bicycle Path to connect areas west of Highway 101 to the San Luis Obispo Downtown area Cannon was retained to provide civil engineering services working with the design team to obtain preliminary approvals and building permits for the construction of about two thirds of a mile of bicycle path The pathway begins at the Cerro San Luis Parking Lot at 101 and Marsh Street running southerly and parallel with the Caltrans right of way to the existing Madonna Inn Site The pathway then continues southwesterly through the Madonna Inn property to a point of connection with new sidewalk improvements at Madonna Road at the Madonna Inn Entry The scope of work included preliminary and final grading plans drainage improvements and calculations coordination with the City on the project and bid assistance and construction administration services Back to Service Information Location San Luis Obispo California Market Civic Municipal Contact Cannon Home About Careers Loose Cannons Cannon Login Client FTP Search for Cannon is a registered Trade Mark

    Original URL path: http://cannoncorp.us/project/irish-hills-bike-path/ (2016-04-28)
    Open archived version from archive



  •